Monday 30 November 2015

Lesson Progress

Today in lesson we got a chance to peer review each others work and I have some constructive criticism on my work to m=improve it overall. The system we used is ABC (Add, Build, Challenge) for me I had the following feedback:

A: Add more cuts and shorter paced clips

B: Lip syncing parts really good but could be shorter and more cuts

C: Develop narrative further

I will then use this information to alter my video on construct a better music video.

Friday 27 November 2015

Shot List

Rough Cut 3

Rough Cut 2

Animatic Storyboard

Font Analysis

<iframe src="//www.slideshare.net/slideshow/embed_code/key/Fl7mmQ9ZOxLPwB" width="668" height="714" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" style="border:1px solid #CCC; border-width:1px; margin-bottom:5px; max-width: 100%;" allowfullscreen> </iframe> <div style="margin-bottom:5px"> <strong> <a href="//www.slideshare.net/bethdavies5/font-analysis-55457494" title="Font analysis" target="_blank">Font analysis</a> </strong> from <strong><a href="//www.slideshare.net/bethdavies5" target="_blank">bethdavies5</a></strong> </div>

Friday 20 November 2015

Shooting Schedule



Our group have decided that we will go out to get the second part of our music video and flashbacks for the throughout part of out music video. we will go get our flashbacks from 1pm on Saturday, where we will visit Crimdon beach to get  some scenes of our artist walking the dog with his girl, and perhaps get some images of him and her walking the dog in the park. we will also visit cafe Rappor in hartlepool town to get some shots of them in the cafe. the plan also includes getting the out of focus shots of the car from rosemary topping however we plan to find a similar place rather than going back to rosemary topping. once we have to sets we just plan to get some shots of them just hanging out in general in Declan's house. the Sunday we plan to leave hartlepool at 5-6 on Sunday to go to the Infinity bridge in Stockton on tees at night to get some romantic shots.

Monday 16 November 2015

Friday 13 November 2015

Evidence of Shooting Footage


Progression 13/10/15

Today we went to the studio and we got more footage of our music video. We filmed three bits of footage, these pieces of footage are of the full song but they were from different angles. one is a close up of a guitar and the other two are of the singer from different angles.

Editing Evidence

Call Sheet

Risk Assessment

Friday 6 November 2015

Rough Cut One

Logo Creation




These are screenshots that are taken in Photoshop that shows how the logo was made. It shows all of the processes that were made to make our logo that will be used in our music video. 

Monday 2 November 2015

Lesson Progress

<iframe src="//www.slideshare.net/slideshow/embed_code/key/2GLetCaHHR8BWR" width="477" height="510" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" style="border:1px solid #CCC; border-width:1px; margin-bottom:5px; max-width: 100%;" allowfullscreen> </iframe> <div style="margin-bottom:5px"> <strong> <a href="//www.slideshare.net/14150892/lesson-progress" title="Lesson Progress" target="_blank">Lesson Progress</a> </strong> from <strong><a href="//www.slideshare.net/14150892" target="_blank">14150892</a></strong> </div>